Montserrat’s Port Development Project in Little Bay aims to provide a sheltered harbor where small cruise ships and cargo vessels can comfortably moor, assist in time management of the port and provide storm surge protection for the Little Bay Town Centre Development. The project will be executed in two phases at an estimated cost of $40 million. Phase 1 includes land reclamation and surfacing, with Phase 2 covering the construction of a breakwater and approximately 360 meters of jetty structure. The Ministry of Communication and Works (MCW) is responsible for the project and it will be implemented by the Public Works Department in conjunction with the Port Authority. Once complete, the port will provide jetty and breakwater development, land reclamation, ferry passenger facilities, facilities for pleasure crafts, and water and electricity services to ships.
08 Oct, 2024 Little Bay/Montserrat, Saint Peter's
Feels Like: ? Humidity: ? Wind: ? Barometer: ?
Temperature
| Temp High(Fahrenheit) | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Temp Low (Fahrenheit) | |||||||||||
| Precipitation (inches) | |||||||||||
| Snow (inches) | |||||||||||
Copyright ©️2023 Travtech, Inc. All Rights Reserved.
Powered by